Spearin Preston and Burrows has started the renovation of the Belt Parkway Bridge over the Paerdegat Basin in Brooklyn. They are using the NEW APE/J&M 416 vibro with a gun-drilled top (eliminates hoses) and are pulling wood piles with the exclusive APE woodpile clamp (affectionately nicknamed the “Woodhead”). The 416 is also driving 14 inch “H” piles using a 126B universal clamp.

Share and Enjoy:
  • Facebook
  • Twitter
  • Google Buzz
  • Yahoo! Buzz
  • MySpace
  • Digg
  • StumbleUpon
  • del.icio.us
  • Add to favorites
  • Print
  • email
  • RSS